While Bolivia’s state-owned tin enterprises, EM Huanuni and EM Vinto, have ambitious expansion plans for the next few years, their production has declined a little in the first nine months of this year. Production of tin-in-concentrates at the Huanuni mine fell by 7.7% year-on-year to 6,714 tonnes in January-September, while refined tin production at the nearby Vinto smelter declined by 1.1% to 8,421 tonnes.

National tin production was, however, supported by better performance by private companies. Total Bolivian tin-in-concentrate production in the nine months to September was 14,735 tonnes, down 1.2% year-on-year, with the fall in Huanuni’s production partly offset by a rise in output from the Colquiri zinc-tin mine operated by Glencore subsidiary Sinchi Wayra and small mines and co-operatives. Total national refined tin production fell 1.1% to 11,154 tonnes, with the fall at Vinto countered by higher production by OMSA.

Comibol president Hector Cordova confirmed last month that construction work for a US$50 million new concentrator at Huanuni was about to begin, with the existing mill to be converted to the processing of lead-zinc-silver ore. The expansion of the Vinto smelter is more advanced, but it will not be possible to increase tin metal production significantly until the mine project is completed.

Privacy Policy

This is your privacy policy content.

This will close in 0 seconds

You cannot copy content of this page